EXERGY’s customer for this project was Samsung Engineering CO, that acted as EPC contractor for the final customer and user, PTT LNG.
- Reference
- /
- CASE STUDIES
PTT LNG RAYONG
Client name:
SAMSUNG ENGINEERING - final customer PTT LNG
Plant Location:
RAYONG, THAILAND
Date of implementation:
2019
Plant size:
5 MWe
Application:
HEAT RECOVERY GAS TURBINES
Gas turbines:
2x SOLAR MARS100
Heat source temperature (diathermic oil):
294°C - 140.8°C
Water or cooling agent:
COLDÂ WATER FROM LNG REGASIFICATION CYCLE AS HEAT SINK
Efficiency gross:
23%
Installation:
OUTDOOR
PTT LNG wanted to increase the efficiency and the sustainability of its operations in its regasification terminal located in Rayong. EXERGY’s solution for this project is an ORC unit equipped with a Radial Outflow Turbine that recovers the exhaust heat downstream generated from the two Solar Mars 100 gas turbines installed in the LNG plant, to generate 5 MWe of electricity.
The regassification process employs a significant amount of water, which is cooled from ambient temperature to approximately 5 °C. This water was, thus, available for feeding the condenser of the ORC in close loop, with no water consumption. In this case the cold water from the LNG regasification cycle as heat sink, was in a temperature range between 5-38 °C.
All the components of the ORC system for this project had to be compliant with API technical standards and this required EXERGY to work in close synergy with the internal manufacturing team to adapt to the market requirements.
By exploiting a large amount of the residual heat, otherwise discharged by the gas turbine into atmosphere, the waste heat recovery system has helped increasing the efficiency of power production and reducing the environmental footprint of the power plant.
Location:
RAYONG, THAILAND
Scope of the resource:
Installation date:
2019
Geothermal steam / brine temperature:
Plant size:
5 MWe

Capacitor:
COLD WATER FROM LNG REGASIFICATION CYCLE AS HEAT SINK


Total installed capacity:
Generator voltage:
Application:
HEAT RECOVERY GAS TURBINES

Installation type:
OUTDOOR
PTT LNG wanted to increase the efficiency and the sustainability of its operations in its regasification terminal located in Rayong. EXERGY’s solution for this project is an ORC unit equipped with a Radial Outflow Turbine that recovers the exhaust heat downstream generated from the two Solar Mars 100 gas turbines installed in the LNG plant, to generate 5 MWe of electricity.
The regassification process employs a significant amount of water, which is cooled from ambient temperature to approximately 5 °C. This water was, thus, available for feeding the condenser of the ORC in close loop, with no water consumption. In this case the cold water from the LNG regasification cycle as heat sink, was in a temperature range between 5-38 °C.
All the components of the ORC system for this project had to be compliant with API technical standards and this required EXERGY to work in close synergy with the internal manufacturing team to adapt to the market requirements.
By exploiting a large amount of the residual heat, otherwise discharged by the gas turbine into atmosphere, the waste heat recovery system has helped increasing the efficiency of power production and reducing the environmental footprint of the power plant.